Our Work · Powering Today, Building Tomorrow

24+ projects across solar & water.

Rooftop solar, PM-KUSUM irrigation, street lighting, WTP, STP and rural drinking water — filter by category below.

WTP ProjectCascade aerator in operation at water treatment plant with filter house

Water Treatment Plant — Cascade Aerator

📍 Rayagada District, Odisha (SH-6)
[XX] MLD
Capacity
Aeration + RSF
Process
2026
Commissioned
WTP ProjectRiver intake well with approach bridge and pump house

River Intake Well & Approach Bridge

📍 Rayagada District, Odisha
Raw water
Intake source
RCC
Structure
2026
Completed
WTP ProjectPump house interior with vertical turbine pumps and LT control panel

Pumping Station — VT Pumps & Controls

📍 Rayagada District, Odisha
2× VT
Pump sets
LT panel
Switchgear
2026
Installed
WTP ProjectWorkers laying transmission pipeline along the highway

Transmission Pipeline Laying

📍 Ambodala, Rayagada–Bhawanipatna Rd
[XX] km
Pipeline length
[Edit] DI/HDPE
Pipe class
2026
In progress
WTP ProjectRCC overhead service reservoir with spiral staircase

Overhead Service Reservoir (OHSR)

📍 Bijepur, Rayagada District, Odisha
[XX] KL
Storage
RCC staging
Structure
2025
Completed
WTP ProjectVillage stand post with treated water flowing from tap

Village Tap Stand — Live Treated Supply

📍 Paikaranipinda, Rayagada District, Odisha
FHTC
Connection type
24×7
Supply
2025
Energised
STP ProjectSewage treatment plant with treatment tanks, screen bar chamber and landscaped compound

Decentralised Sewage Treatment Plant

📍 Gumla Colony, Bokaro Steel City, Jharkhand
[XX] KLD
Capacity
Screen + bio
Treatment train
2025
Commissioned
STP ProjectSTP treatment tanks with walkway railing and equipment shed

STP — Treatment Tanks & Process Units

📍 Gumla Colony, Bokaro Steel City, Jharkhand
[XX] KLD
Capacity
Reuse-ready
Treated output
2025
Commissioned
Drinking WaterSolar-powered iron removal plant with filtration vessels and overhead tank

Iron Removal Plant with Solar Pumping

📍 [Edit: Village, District]
5000 L
Tank capacity
4-stage
Filtration
2024
Commissioned
Drinking WaterIron removal filtration units with solar panel and overhead tank

Solar Water Treatment & Supply Unit

📍 [Edit: Village, District]
5000 L
Tank capacity
100%
Solar powered
2024
Commissioned
Drinking WaterVillage community collecting water from solar-powered tank system

Village Piped Water Supply — In Daily Use

📍 [Edit: Village, District]
250+
People served
24×7
Availability
2023
Commissioned
Jal Jeevan MissionGalvanized steel overhead water tank tower

Overhead Tank Tower — Gosani Block

📍 Gajapati District, Odisha
5000 L
Tank capacity
GI steel
Structure
2023
Commissioned
Jal Jeevan MissionOverhead tank tower installation among village trees

Tribal Village Water Supply Tower

📍 Gajapati District, Odisha
5000 L
Tank capacity
GI steel
Structure
2023
Commissioned
Drinking WaterSolar panel topped water tank tower with villager collecting water

Solar Tank Tower — Community Supply

📍 [Edit: Village, District]
3000 L
Tank capacity
100%
Solar powered
2022
Commissioned
PM-KUSUMSolar pump panels installed beside a paddy field pond

Solar Irrigation Pump — Paddy Field

📍 [Edit: Village, District]
5 HP
Pump capacity
60%
Subsidy
2024
Commissioned
PM-KUSUMThree solar panel arrays installed on a farm pond bund

Pond-Side Solar Pumping System

📍 [Edit: Village, District]
7.5 HP
Pump capacity
60%
Subsidy
2024
Commissioned
PM-KUSUMSolar tracker structure with pump house near green paddy fields

Solar Pump with Pump House

📍 [Edit: Village, District]
5 HP
Pump capacity
100%
Diesel replaced
2023
Commissioned
PM-KUSUMGround-mounted solar arrays in a plantation grove

Plantation Irrigation — Twin Array

📍 [Edit: Village, District]
10 HP
Pump capacity
60%
Subsidy
2025
Commissioned
Street LightSolar street light installed along a village road

Village Road Solar Street Lighting

📍 [Edit: Panchayat / road stretch]
12 W
LED fixture
Dusk-dawn
Auto operation
2023
Installed
Street LightInstallation team erecting a solar street light pole in a village

Solar Street Light — Village Installation

📍 [Edit: Village, District]
[XX]
Lights installed
5 yr
Battery life
2024
Installed
Rooftop SolarElevated rooftop solar installation with dual mounting structures

Residential Rooftop System — Elevated Structure

📍 [Edit: Location, District, Odisha]
5 kW
Capacity
₹78,000
Subsidy availed
2024
Commissioned
InstitutionalLarge rooftop solar power plant on institutional building

Institutional Rooftop Power Plant

📍 [Edit: Institution name & city]
50 kW
Capacity
72 MWh
Annual generation
2023
Commissioned
Govt ProjectLarge-scale rooftop solar array across government building campus

Campus-Wide Solar Array — Govt Facility

📍 [Edit: Department & location]
100 kW
Capacity
₹9.6 L
Annual savings
2023
Commissioned
Rooftop SolarDense rooftop solar panel array

High-Density Rooftop Installation

📍 [Edit: Client & location]
60 kW
Capacity
25 yr
Panel warranty
2024
Commissioned

Details in [brackets] are placeholders pending final project data. Subsidy figures as per latest Govt notifications.

Your site could be our next case study.

Free survey · End-to-end subsidy paperwork · Long-term O&M

Book Free Site Survey →